Sunday, 18 March 2012

Construction- Schedule

  • 11/10/2011-Filming Ella and Neil in a bedroom setting, filming in the media classroom, black costume and suit costume needed.

  • 13/10/2011-Filming Abby and Neil in the Television studios, black costume and suit needed.

  • 18/10/2011-Filming Abby, Ayesha, Ella and Neil in T.V studio, all actresses black costumes and Neils suit needed.

  • 22/10/2011-Filming Ella, Abby and Ayesha in T.V Studio, all actresses black costumes needed.

  • 25/10/2011-Capture and editing footage filmed so far in the edit suite.

  • 29/10/2011-Filming in the Odeon Cinema in Wrexham, Ayesha, Abby and Neil needed, in casual costumes. 

  • 1/11/2011-Filming in the college cafe, Abby, Neil and Ayesha in casual costumes needed.


  • 2/11/2011-Capturing and editing footage filmed in the edit suite.

  • 6/11/2011-Filming Ella, Abby, Ayesha and Neil in the T.V Studio, all actresses black costumes and Neils black suit needed.

  • 16/11/2011-Capturing and editing footage filmed in the edit suite.

  • 23/11/2011-Editing footage in the edit suite.

  • 29/11/2011-Filming Abby using a mobile phone prop, casual costume needed.

  • 6/12/2011-Capture remaining footage and final editing in the edit suite.


We created this schedule to ensure that we were all present when we were needed, that we knew exactly what we were doing so we were always prepared, and to make sure that that we had enough time to complete the entire production.